M&M Work Schedules Wastewater Treatment Plants Monthly Hand
Cleaned Grit Chamber · Calculate and record velocity and detention time, and compare to design and process standards Mechanically Cleaned Grit Chamber · Calculate and record velocity and detention time, and compare to design and process standards Aerated Grit Chamber · Blow out all air lines · Clean diffusers Þ Grease swing arm knees · Calculate and record surface settling rate and detention time, and compare to design and process standards Primary Clarifiers · Check the overload system and alarm · Check for sludge buildup · Check and adjust sludge pumping schedule · Check oil levels in worm gear and spur gear · Calculate and record detention time, surface settling rate, weir overflow rate, removal efficiencies, and sludge production rates, and compare to design and process standards Trickling Filter · Flush vents, underdrains and collection boxes · Check the distribution (pan test) · Calculate and record the hydraulic and organic loading rates, and removal efficiencies, and compare to design and process standards Activated Sludge Aeration Tank · Blow out all air lines · Clean diffusers Þ Grease swing arm knees · Calculate and record detention time, organic loading rates, and removal efficiencies, and compare to design and process standards Lagoons · Ponds Þ Check for sludge deposits Þ Check for short circuiting Þ Check for dead spots · Transfer Structures Þ Clean · Lab Tests Þ Run a D.O. profile in the pond Final Clarifiers · Check the overload system and alarm · Check for sludge buildup · Check and adjust sludge pumping schedule · Check oil levels in worm gear and spur gear · Calculate and record detention time, surface settling rate, weir overflow rate, removal efficiencies, and sludge production rates, and compare to design and process standards Chlorination · Calculate and record the chlorine dosage, demand, and residual, and compare to design and process standards Anaerobic Digesters · Blow out all gas lines · Check and adjust digested sludge removal schedule · Check and record carbon dioxide concentrations in the stack gases from furnaces burning digester gas · Grease wheels on floating cover · Calculate and record the detention time, volatile solids loading rate, volatile solids reduction, volatile acid/alkalinity ratio, gas production rates, and the digested sludge production rate, and compare to design and process standards Aerobic Digesters · Blow out all gas lines · Clean diffusers · Grease swing arm knees · Check and adjust digested sludge removal schedule · Calculate and record the detention time, volatile solids loading rate, volatile solids reduction, and the digested sludge production rate, and compare to design and process standards Control Panels · Check heaters and electrical connections for corrosion, tightness, and proper operation · Clean outside of panel · Turn off power Þ Vacuum and clean inside Motors · Check heaters and electrical connections for corrosion, tightness, and proper operation · Check draw on each lead wire Þ All should read the same and agree with the ratings · Clean outside of panel · Turn off power Þ Vacuum and clean inside Blowers and Compressors · Clean filters Flow Meters and Recorders · Calibrate by hand Valves · Operate all valves Þ Record and compare number turns between full open and full close · Lubricate all valve stems Þ Check for wear and broken threads · Clean · Check packing · Telescopic Þ Grease · Plug Þ Grease · Ball check Þ Check balls and seats for wear, pitting, and cracks · Swing check Þ Operate lever to see if broken shear pin or shaft Þ Lubricate shaft Standby Generators · Check battery Þ Specific gravity · Check condition of gauges Furnace · Replace filters General · Gates and Fences Þ Check for corrosion Þ Check signs to see that they are visible and readable
Return to M&M Work Schedules For more information, call 515-232-1663 |